- Supply and Installation of Secondary Pipe System in Abu Alanda, DBIO (C5)
|
Owner |
: |
Ministry of Water Irrigation |
Restructuring of East Amman water network, 130 km of DIP (100 - 600 mm) including values, pressure reducers and commissioning the network 45 km of house connections serving 2500 houses.
|